Construction

1

Heat the asphalt

2

Apply asphalt on the water-proof layer

3

Glue the XPS heat-insulation board

4

Lay the WIN-LUCK

5

Lay the welded steel wire net

6

Finally finish with laying the RC or PC

No.46-4, Chiahsi 2 Lane, Chiahsi Tsun, Tatsun Hsiang, Changhua Hsien, Taiwan
Tel:+886-4-8522060
E-mail:eps@laiadvance.com.tw
COPYRIGHT © 2017 LAI ADVANCE INDUSTRY CO.,LTD. ALL Rights Reserved.
Design by DAYYEU